Skip directly to content

Homepage tekst

Waste Water Treatment

Teblick has extensive experience when it comes to builing neutralization stations; batch, continuous and semi-continuous.

Where possible, a waste water treatment station will be built as a standalone unit, taking your future expansions into account. All of our installations must pass a full Factory Acceptance Test (FAT) before they leave te workshop.

Processes include:

  • Filtration
  • pH-correction
  • Temperature correction
  • Decontamination
  • Process mixing

We provide full-circle assistance; from design, production, installation and start-up, to training and services - Teblick is your partner!

 

Neutralisation Control panel
Neutralization station 3 m3/h with chemical decontamination
Factory acceptance test  (FAT ) setup
pre- filtration skid from a batch neutralization
Final check skid with instrumentation
Filtration skid with heat exchanger
Instrumentation trending the pH, temperature, BOD, BOC
Semi continuous neutralization station for 450 m³/day for 100°C
Standalone unit with profibus communication in a neutralization station
Neutralization station for continues use 350 m³/day
Batch neutralization station 8 m³/h.
Design of a neutralization station in 3D